top of page

Chuckanut Overlook

The primary objective on this project was to solve an erosion issue that was undermining driveway & retaining wall. Working with geotechnical engineers a shotcrete retaining wall with horizontal pin piles was installed to stabilize the hillside.

Team

Landscape Architect/ Contractor: Project Landworks

bottom of page